Overview
Availability: Grow Plan is available for Metrc and Standalone facilities. It is not supported for BioTrack facilities at this time.
- Objective: See every grow plan you can reach in one list, with where each one stands and how its harvest compares with the plan.
- Benefit: You see which plans start soon, which are late, which locations and strains are booked, and which plans lose plants faster than planned, without opening each plan.
- Business Logic: The list covers every facility you can reach, in every stage. The tabs narrow it to one stage, and the Business Unit, Facility, and Date Range filters narrow it further. The tiles are based on the plans the tab and filters select. The Yield Comparison tile counts only plans that have harvested, and the Harvest Overview variance leaves out plans with no linked plant batch, as explained under Understand the Grow Plan Calculation.
Glossary
Item: What a package is, such as a strain's flower or a finished product, set up in Canix with its category and unit. Every package has one item, and the item's kind of unit (weight, volume, or count) decides how the package's quantity is counted.
Plant batch: A group of young plants, such as plantings from seeds or clones, tracked together before they are tracked one by one. On Metrc and Standalone, Unpack into Plantings makes plant batches from packages.
Harvest: Flowering plants cut under one name, with the wet weight of each plant, a strain, a drying location, and a harvest date. Packages and waste are made from it until it is finished. On Metrc the official harvest lives in Metrc; on Standalone it lives in Canix.
Packaged weight: The total original weight of the packages made from a harvest. Canix adds it up from the packages, and a grow plan breaks it down by item sub-type.
Plant: A cannabis plant tracked on its own, with its own tag, a strain, a location, and a state. A plant comes from a plant batch, a package, or a mother plant, depending on the system, and is tracked from then until it is harvested, destroyed, or packaged. Plants are listed on the Plants screen, one view per state.
Planting: One young plant counted in a plant batch before it gets its own tag. Packaging plantings, destroying them, or moving them to tagged plants with the Update Growth Phase lowers the batch's number of plantings.
Clone: A cutting taken from a plant, usually a mother plant, to grow a new plant of the same strain. Clones start a plant batch of type Clone or are packaged as unrooted clones.
Seed: A cannabis seed grown into a new plant. On Metrc and Standalone seeds start a plant batch of type Seed.
Strain: The cannabis variety of a plant, plant batch, harvest, or item set up for each facility on the Strains screen. On Metrc, Metrc keeps each strain and each plant's strain too, and Change Strain changes a plant's strain in Metrc and in Canix.
Location: A place in a facility where plants, plant batches, harvests, and packages are kept, such as a room, a bench, or a shelf, set up in Canix with a name and a location type. A location can sit inside another one, and its full name is the path from the top, such as Flower Room 1 > Bench 3. On Metrc licenses that use locations, each location is, or sits inside, a location or room of the state system, and an action that uses it reports that one.
Item sub-type: A finer grouping of items inside an item type, set up for each facility on the Item Sub-Types screen, with its own weight unit. Each item has at most one sub-type, chosen in the item form's Sub-Type field or with Assign Sub-Types on Items. Price lists can price items by sub-type, bills of materials can use a sub-type as a source or an output, and a harvest's details can split its packaged weight and sales by sub-type. Strains set their expected output by it, and a grow plan adds up its actual packaged weight by it.
Grow plan: A plan for one cultivation cycle of one strain in one location, built on the Grow Planner, which shows where Canix has turned it on for the company or facility. Canix works out the cycle's dates, plant counts, and weights backward from the plan's Target Harvest Date, and sets what the plants of its linked plant batches really did beside them.
Mom stock renewal date: The day to renew the mother plants for a grow plan: the plan's clone cut date, which is its planned immature start date, plus its facility's Mom Stock Renewal Buffer.
Mom stock renewal buffer: A facility setting, in days, that offsets each grow plan's clone cut date to give its Mom Stock Renewal date. A negative number puts the renewal before the clones are cut. It starts at 0 and is set in Facility Management, under Cultivation Settings.
Actual values: What the plants of a grow plan's linked plant batches really did: the plant count of each phase, the planted phase, harvest and dry dates, and the harvest and packaged weights. Canix works them out each time the plan is read. A plan with no linked plant batch has none, shown as a dash.
Business unit: A named group of a company's facilities, set up under Master Data, Business Units. The Grow Planner can show the plans of a business unit's facilities together. A user sees a business unit only when they have access to every facility in it.
Plan at risk: A grow plan that is losing plants faster than it planned: its actual mortality is higher than its planned mortality. The Grow Planner's Groups at Risk tile lists these plans. A cancelled plan is never at risk.
Prerequisites & Setup
Before beginning, ensure the following requirements are met:
-
Permissions: You need View or Edit access to Grow Planner to open the Grow Planner and Edit access to create plans or use the actions in its menus.
- Your administrator sets it in Analyze & Support › Admin & Settings › Permission Groups › your group › Action Permissions › Plants. The Grow Planner shows only where Canix has turned it on for your company or facility.
-
Necessary Data:
- At least one strain set up with its phase durations, mortality rates, and expected yield per item sub-type. The plan takes these values from the strain when it is created.
- At least one location set up in the facility. The plan is built around one location.
- At least one grow plan in a facility you can reach. Until there is one, the Grow Planner opens on its first-time page.
-
For the Business Unit filter, business units are set up in Analyze & Support › Master Data › Business Units.
Step-by-Step Instructions
Create a Grow Plan
- Navigate to: Operate › Cultivation › Grow Planner
- The relevant tabs and sections are: All, Planned, In Progress, Finished, Blocked, and Cancelled.
- Click on Create New Plan to start a new plan.
- Complete the Create New Plan form.
- Click Create Plan
What the form asks for:
- Plan Name, Planned Strain, Location (any available room), Target Harvest Date and Plant Count are required. The facility comes from the one you are working in.
- Plant Batch is optional. You can create a plan before the clones are cut and link batches later. Until a batch is linked, the plan uses the Plant Count you entered.
- Canix calculates the phase dates and plant counts backward from the Target Harvest Date, and you can adjust them in the form. Changes apply only to this plan, not to the strain or location.
Grow Plan Actions
- Select the plan you want to view by clicking on the name.
- You can filter the list by Business Unit, Facility Name, and Date Range
-
You can duplicate, unblock, or cancel a plan by clicking in the check box next to the plan and selecting the Actions menu drop-down.
Plan status
- A plan starts as Planned. It moves to In Progress automatically when the first plant batch is linked.
- Finishing a plan is manual. When the harvest date or dry date is filled in, Canix prompts you that the plan may be ready to finish, but it never changes the status on its own.
- Reopening a Finished plan is manual and needs permission.
- Blocking and unblocking a plan are manual.
- Every status change is recorded in Activity History.
Link plant batches
- Link batches when you create the plan, from the plan with the Create Planting action, or from Create Plantings from Mother.
- Once batches are linked, the Plant Count becomes the total across them. You can still override it, but the override resets each time you link another batch.
- A batch created by splitting a linked batch is not linked automatically. Its plants stay outside the plan until you link it.
Plan details
- Click a plan's name to open its details. The page shows the values you entered when you created the plan and the Planned, Estimated and Actual values for each phase of the cycle.
- Planned values are calculated when the plan is created, and they stay as the original baseline.
- You can update the Estimated values at any time to show what you now expect. This does not change the Planned values.
- Actual values are calculated by Canix from the plant batches linked to the plan. You cannot edit them.
- Changes to a plan's values and estimates are recorded in Activity History.
Understanding the Grow Plan
- Canix lists every plan of the facilities you can reach, with its Plan Name, Stage, Strain, Facility, Location, Mom Stock Renewal Date, Phase, Harvest Date, Total Harvested Weight, Packaged Weight and Remaining Harvested Weight. Text too long for its column ends in an ellipsis; point at it to read it in full.
- The Stage column shows the plan's stage, a four-step bar for Immature, Vegetative, Flowering and Harvest, and one line about what needs attention, such as "Start date passed · 3 days". Point at that line to read the stage, the line, and, for a Blocked or Cancelled plan, the reason together.
- Mom Stock Renewal Date shows the days left, or "N Days Overdue", above the date. Hover over it to see the clone cut date and the facility's renewal buffer behind it.
- Harvest Date, Total Harvested Weight, and Packaged Weight each have a Plan, an Act and a Var column. Var is Act minus Plan; for the harvest date it counts days, and a later harvest shows in red.
- When the plan has sub-types, select its Packaged Weight Plan to see each sub-type with its Plan, Act and Var.
- The Cancelled tab adds a Cancellation Reason column and the Blocked tab a Blocked Reason column. With no plans, the Finished, Blocked and Cancelled tabs say so and offer View All Plans.
- The Phase column shows one chip for each phase the plan's plants are in, with the percentage of plants in each. The phase with the most plants comes first. Custom growth phases appear as the phase they belong to. A plan with no linked plant batch shows no phase.
Understand the Grow Plan Calculation
- Harvest Overview: Planned Plants adds up the planned plant count of the plans selected by the tab and filters. Actual Plants adds up the plant counts of their linked plant batches. Variance is Actual minus Planned and its share of Planned. Plans with no linked plant batch are left out of the variance, because they have no actual count yet.
- Yield Comparison: Planned Categorized Weight and Actual Categorized Weight add up each plan's weight across its item sub-types. Only plans that have harvested are counted, meaning at least one package with a configured sub-type has been made from the plan's harvest. The tile says how many plans it is based on ("Based on N of M plans harvested") and shows "No plan has harvested yet" until one has.
- Groups at Risk: each plan losing plants faster than it planned to, its name beside "X% mortality rate vs Y% planned", highest first. Select the name to open the plan. Otherwise "No groups at risk".
Important Considerations
- Business Unit reads "All Business Units" by default, until you pick one or more units, then the number picked. It lists only the business units to which you have access. Picking units shows only the plans of their facilities.
- Facility reads "All Facilities" by default, the facility's name, or the number picked. With business units picked, it offers only their facilities.
- Date Range narrows the plans by their Target Harvest Date, the Plan column under Harvest Date. Either end can stay open.
System Impacts & Dependencies
Changing data in one area often triggers updates elsewhere. Understanding these relationships is critical for data integrity.
| Action Taken | Impacted Area | Description of Change |
|---|---|---|
| Opening the Grow Planner, a tab or a filter | Grow plans | Nothing changes; the list and the tiles show the plans selected. |
| Using an action from the menus | The selected plans | Each plan that fits the action changes; the list and the tiles show the result. |
Troubleshooting Common Issues
If you encounter an error, check these common scenarios before contacting support.
- Error message - "You do not have access to this page, ask your company administrator for access": Ask your administrator for View or Edit access to Grow Planner.
- Error message - "Current permissions do not allow this action": Ask your administrator for Edit access to Grow Planner.
- Error message - "A plan needs a location and a strain to grow against.": Validate that an active location and active strain are selected.
- Error message - "No business units yet. Set them up to group facilities.": Go to Analyze & Support > Master Data > Business Units and add a Business Unit or ask your Administrator for access to every facility in the Business Unit.
- Error message - "A business unit includes a facility you cannot reach.": Ask your administrator for access to every facility in the unit.
- Error message - "The facility you are working in does not show cultivator items.": Switch to a cultivator or microbusiness facility.
For further assistance, join our Office Hours.